Bharbung Hydroelectric Project, Feasibility and EIA

Bharbung Hydroelectric Project, Feasibility and EIA

SN YEAR PROEJCT CLIENT
1 1976 Detailed Feasibility study of Chyanthapu Mini Hydel Scheme (80 KW) in Panchthar District SHDB
2 1976 Detailed Feasibility study of Taplejung Mini Hydel Scheme (100 KW) in Taplegunj District SHDB
3 1978 Detailed Feasibility study of Jiri Mini Hydel Scheme (80 KW) in Dolkha District SHDB
4 1978 Detailed Feasibility study of Terhathum Mini Hydel Scheme (100KW) in Terhathum District SHDB
5 1981 Detailed Design of Power Supply Scheme of Lumbimi Development Project UNDP
6 1982 Survey and design of Butwal-Lumbini 33 KV Transmission Line for Lumbini Development Project UNDP
7 1982/83 Feasibility study of Diktel, Lumle and Illam Mini Hydel Projects (2300 KW) ODA, UK
8 1982 Detailed electrical designs of Power Supply Scheme of Butwal Industrial District for BID BID
9 1981/84 Detailed Electrical Design of power supply and distribution scheme & construction supervision of Sagarnath Forestry Development Project ADB
10 1992 Pancheswor Hydro Electric Project (6480 MW) -
11 1995 Kaligandaki Hydroelectric Project (144 MW) -
12 - West Seti Hydro Electric Power Project (750 MW) -
13 1995 Devighat-Dhading 33kV Transmission Line GTZ
14 - EIA Study of 14 MW Upper Modi Hydropower Project GITEC, China
15 1999 Sharada-Babai Hydropower Project (51MW) -
16 2008 Upper Mailun Khola Hydropower Project (5 MW) -
17 2008/09 Likhu-IV Hydropower Project (120 MW) Green Ventures Pvt. Ltd
18 2009/10 Preparation of Detailed Project Report of Likhu A (51 MW), Likhu 1 (77MW) and Likhu 2 (55MW)HEP -
19 2010/11 Feasibility Study and Detailed Engineering Design of Lower Khare Khola Small Hydropower Project (11 MW) -
20 2011/12 Feasibility Study and Detailed Engineering Design of Lapche Khola Hydropower Project (160 MW) -
21 2020/2024 Feasibility and EIA Study of Humla-Karnali (62 MW), Humla District DoED
22 2020/2026 Feasibility and EIA Study of Bharbhung Storage Hydropower Project including Tatu ROR Project (10MW), Dolpa District (512 MW) DoED
Power & Energy

Bharbung HEP - Installation of Automatic Water Level Recorder

Power & Energy

Bharbung HEP - Establishment of Control Points using DGPS survey

Power & Energy

Humla Karnali HEP

Power & Energy

Humla Karnali HEP Site

Power & Energy

Likhu 1,2 & A HEPs

Power & Energy

Mailun Khola HEP

Power & Energy

Likhu IV HEP - Surveyor mapping Powerhouse area

Power & Energy

Upper Mailun HEP (Pipe Alignment)