SN | YEAR | PROJECT | CLIENT | |
---|---|---|---|---|
1 | 1978 | Beni-Jomsom-Mustang Road 179 km | DOR | |
2 | 1979 | Mechi River Bridge 570m span | DOR | |
3 | 1980 | Surkhet-Jumla Track 200km CIDA | (K-BIRD) | |
4 | 1981 | Kohalpur-Mahakali Road on EWH 155km | Norconsult (IDA) | |
5 | 1981 | Dumre-Besisahar Road 42km | ILO | |
6 | 1984 | Nepalgunj-Gularia Road | 34km UNDP (OPE) | |
7 | 1984 | Feeder Road to Khumbur | UNDP (OPE) | |
8 | 1985-1995 | First Feeder Roads Project (Bhatkanda-Doti (74km- FS); Design of Several Bridges; Design of Roads (88+101+60+74 km)) | ADB | |
9 | 1986-1987 | Feeder Roads Project (PPTA) | ADB | |
10 | 1987 | Inland Water Transportation (Sunkoshi River (Dolalghat to Triveni) 219km) | MoWT | |
11 | 1987 | Road Flood Rehab - Arniko Project | IBRD | |
12 | 1990 | Easter Feeder Roads in Bhutan 56 km | UNDP/PWD | |
13 | 1991 | Road Flood Rehabilitation Project: Thankot - Naubise (11+250 - 26+100) km Road Project. | DOR (IBRD) | |
14 | 1991 | Project Formation Report for District Roads | UNCDF | |
15 | 1992 | PPTA - Bisnumati Link Road | ADB | |
16 | 1992 | Geotechnical Investigation of Dhulikhel-Dolalghat Section ITECO | AG | |
17 | 1993 | Flood Damage Assessment Study | UNDP / HMG | |
18 | 1995 | Arniko Highway Maintenance (30-57km) | sDC/DOR | |
19 | 1995 | Arniko Highway Maintenance (57-87km) | SDC/DOR | |
20 | 1995-96 | Priority Investment Plan (PIP) | IDA/DOR | |
21 | 1996-97 | Road Maintenance and Rehabilitation Project | IDA/DOR | |
22 | 1996 | Janakpur-Dhanusadham Feeder Road Project (18 km) | UNCDF/DOR UNCDF/DOR | |
23 | 1995-96 | Road Maintenance project-Design and Supervision of Resealing Training Contract Package I Feeder road F35 Ambukhaireni-Gorkha Road | ODA | |
24 | 1999 | Road Maintenance and Rehabilitation Project | IDA | |
25 | 1995 | Badigad Bridge at Rudrabeni Gulmi District | DOR | |
26 | 1999 | Road Maintenance and Rehabilitation Project | IDA | |
27 | 2000 | Road Maintenance project Design & Supervision of Resealing Training Contract Package 11 for rehabilitation of Bardhagat-Dumkibas(27km) and Sunwal-Parasi(9km) | ODA | |
28 | 2000 | River TraIning and Approach Road for Thopla Bridge Site in MalekhuDhading Road for DSD Dillinger Stahlbow GmbH DSD Dillinger Stahlbow | GmbH | |
29 | 1999 | Road maintenance & Development Project | IDA | |
30 | 2002 | RMDP Additional Work | IDA | |
31 | 2002/2003 | Dipayal-Chamara-Chautara District Road Rajpur-Tikhetar Section (35.825km) | DFID | |
32 | 2003/2004 | Road Network Development Project | ADB | |
33 | 2001/2004 | RMDP-Finalization of design and construction supervision New Road Construction and upgrading works | IDA/DOR | |
34 | 2010 | Sub-Regional Transport Enhancement Project as V.O. 4 under Road Connectivity Sector I Project {ADB Grant No. 0051-NEP(SF)} | ADB | |
35 | 2011 | Detailed Design of Upgrading/Widening of Roads to Six lance standard for Package 2: Belhiya-Butwal Road(24km) | ||
36 | 2011 | Road Improvement Project Construction Supervision of Road Upgrading Works (Package A) | ||
37 | 2012 | Feasibility Study: Detailed Design and Construction Supervision of Road Connectivity Sector I Project {ADB Grant No. 0051-NEPISF)} | ADB | |
38 | 2015-2020 | Detailed Engineering Survey: Design Preparation of DPR and Construction Supervision under Road Improvement Project (RIP-III) Package I (Exim Bank of India funded) | Exim Bank-India | |
39 | 2016-2020 | Detailed Engineering Survey: Design Preparation of DPR and Construction Supervision under Road Improvement Project (RIP-III) Package IV (Exim Bank of India funded) | Exim Bank-India | |
40 | 2020/01 | Detailed Survey Design and Preparation of DPR of Satdobato-RatnaparkNarayangopal Chowk (SRN) | Metrorail Department of Railways | |
41 | 2020/05 | Transportation Assessment to Transport Bulk/Large Cargo from India Border Custom Location to MCA-Nepal Designated Proposed Substation Locations | MCC (US) |