1 | 1976 | Detailed Feasibility study of Chyanthapu Mini Hydel Scheme (80 KW) in Panchthar District | SHDB |
2 | 1976 | Detailed Feasibility study of Taplejung Mini Hydel Scheme (100 KW) in Taplegunj District | SHDB |
3 | 1978 | Detailed Feasibility study of Jiri Mini Hydel Scheme (80 KW) in Dolkha District | SHDB |
4 | 1978 | Detailed Feasibility study of Terhathum Mini Hydel Scheme (100KW) in Terhathum district | SHDB |
5 | 1981 | Detailed Design of Power Supply Scheme of Lumbimi Development Project | UNDP |
6 | 1982 | Survey and design of Butwal-Lumbini 33 KV Transmission Line for Lumbini Development Project | UNDP |
7 | 1982/83 | Feasibility study of Diktel Lumle and Illam Mini Hydel Projects (2300 KW) | ODA UK |
8 | 1982 | Detailed electrical designs of Power Supply Scheme of Butwal Industrial District for BID | BID |
9 | 1981/84 | Detailed Electrical Design of power supply and distribution scheme & construction supervision of Sagarnath Forestry Development Project | ADB |
10 | 1992 | Pancheswor Hydro Electric Project (6480 MW) |
11 | 1995 | Kaligandaki Hydroelectric Project (144 MW) |
12 | | West Seti Hydro Electric Power Project (750 MW) |
13 | 1995 | Devighat-Dhading 33kV Transmission Line GTZ |
14 | | EIA Study of 14 MW Upper Modi Hydropower Project | GITEC China |
15 | 1999 | Sharada-Babai Hydropower Project (51MW) |
16 | 2008 | Upper Mailun Khola Hydropower Project (5 MW) |
17 | 2008/9 | Likhu-IV Hydropower Project (120 MW) Green Ventures Pvt. Ltd |
18 | 2009/10 | Preparation of Detailed Project Report of Likhu A (51 MW) Likhu 1 (77MW) and Likhu 2 (55MW) | HEP |
19 | 2010/11 | Feasibility Study and Detailed Engineering Design of Lower Khare Khola Small Hydropower Project (11 MW) |
20 | 2011/12 | Feasibility Study and Detailed Engineering Design of Lapche Khola Hydropower Project (160 MW) |
21 | 2020/03 | Feasibility and EIA Study of Humla-Karnali (62 MW) | Humla District DoED |
22 | 2020 | Feasibility and EIA Study of Bharbhung Storage Hydropower Project including Tatu ROR Project (10MW) Dolpa District (512 MW) * LOI issued Contract signing pending COVID normalization | DoED |