Power & Energy

SN YEAR PROEJCT CLIENT
1 1976 Detailed Feasibility study of Chyanthapu Mini Hydel Scheme (80 KW) in Panchthar District SHDB
2 1976 Detailed Feasibility study of Taplejung Mini Hydel Scheme (100 KW) in Taplegunj District SHDB
3 1978 Detailed Feasibility study of Jiri Mini Hydel Scheme (80 KW) in Dolkha District SHDB
4 1978 Detailed Feasibility study of Terhathum Mini Hydel Scheme (100KW) in Terhathum district SHDB
5 1981 Detailed Design of Power Supply Scheme of Lumbimi Development Project UNDP
6 1982 Survey and design of Butwal-Lumbini 33 KV Transmission Line for Lumbini Development Project UNDP
7 1982/83 Feasibility study of Diktel Lumle and Illam Mini Hydel Projects (2300 KW) ODA UK
8 1982 Detailed electrical designs of Power Supply Scheme of Butwal Industrial District for BID BID
9 1981/84 Detailed Electrical Design of power supply and distribution scheme & construction supervision of Sagarnath Forestry Development Project ADB
10 1992 Pancheswor Hydro Electric Project (6480 MW)
11 1995 Kaligandaki Hydroelectric Project (144 MW)
12 West Seti Hydro Electric Power Project (750 MW)
13 1995 Devighat-Dhading 33kV Transmission Line GTZ
14 EIA Study of 14 MW Upper Modi Hydropower Project GITEC China
15 1999 Sharada-Babai Hydropower Project (51MW)
16 2008 Upper Mailun Khola Hydropower Project (5 MW)
17 2008/9 Likhu-IV Hydropower Project (120 MW) Green Ventures Pvt. Ltd
18 2009/10 Preparation of Detailed Project Report of Likhu A (51 MW) Likhu 1 (77MW) and Likhu 2 (55MW) HEP
19 2010/11 Feasibility Study and Detailed Engineering Design of Lower Khare Khola Small Hydropower Project (11 MW)
20 2011/12 Feasibility Study and Detailed Engineering Design of Lapche Khola Hydropower Project (160 MW)
21 2020/03 Feasibility and EIA Study of Humla-Karnali (62 MW) Humla District DoED
22 2020 Feasibility and EIA Study of Bharbhung Storage Hydropower Project including Tatu ROR Project (10MW) Dolpa District (512 MW) * LOI issued Contract signing pending COVID normalization DoED