SN YEAR PROJECT CLIENT
1 1979 Pre feasibility study of “Dharna Khola Irrigation Project” (150ha) of Nuwakot District DIHM
2 1980 Benchmark survey for “Sunsari Morang Irrigation Project” IDA
3 1980/83 Priority area design of “Sunsari Morang Irrigation Project” IBRD
4 1982/83 Detailed Design, including geological, hydro-meteorological and socio-economic study under Resource and Conservation and Utilisation Project

“Dhuwakot Irrigation Project” (44 ha) in Gorkha District

“Marpha Irrigation Project” (22.25ha) in Mustang District

“Kagbeni Irrigation Project” (14.52 ha) in Mustang district

“Ghami (Wards 2,3,4,8 and 9) Irrigation Project” (83.21 ha) in Mustang district

SECID/USAID
5 1982 Detailed Survey and stage I design of “Namdu Irrigation Project” (63 ha) Sir M MacDonald and Partners
6 1983 Detailed design of “Tumlingtar Irrigation Project” Eastern Regional Directorate/DHIM
7 1984 Detailed survey of “Tumlingtar Irrigation Project” ODA
8 1982/84 Detailed design of Blocks I, II, and III (3531 ha) Irrigation Area of IDA financed “Mahakali Irrigation Project” IDA
9 1983 Design of pumped irrigation scheme from existing treatment plant as “Bhaktapur Alternative Irrigtion Project” GTZ
10 1986 Water Use Inventory Study of Rautahat District Canadian Intl’ Water & Energy Consultants
11 1985 Water Use Inventory Study of Rupandehi District Canadian Intl’ Water & Energy Consultants
12 1987 Detailed topographical survey of “Rainastar Irrigation Project” (850 ha) DHIM
13 1986/87 Detailed survey, hydraulic and structural design and preparation of cost estimate of 21,000 has of “Sunsari Morang Irrigation Project” IBRD
14 1989 Detailed feasibility and project preparation of “Thansing Irrigation Project” (220ha) IDA/DOI
15 1989 “Water Use Inventory Study” of Pyuthan District Canadian Intl’ Water & Energy Consultants
16 1989 Detailed feasibility and project preparation of “Sarikhet Palanse Irrigation Project” (130ha) DOI
17 1990 Study of “Greater Kathmandu Drainage Master Plan” WB/Dept. of Water Supply and Sewerage
18 1991 Study on Ground Water Resources of Rupendehi, Nawalparasi and Kapilvastu districts FINIDA
19 1998 Assisting in Construction supervision of IBRD financed Sunsari-Morang Irrigation Project Stage I and Stage II, 21000 ha IBRD
20 1993 Flood Damage Assessment Study for:

Bagmati Irrigation Project

East Rapti Irrigation Project

Narayani Zone Irrigation Development Project

Kamala Irrigation Project

UNDP/HMG
21 Feasibility Study for Irrigation from Trishuli HPP Tail Water Discharge JICA
22 2002 Nepal Irrigation Sector Project/ Institutional Development of Department of Hydrology and Meterorology Project under Nepal Irrigation Sector Project (NISP) WB/Department of Hydrology and Meteorology